Fredericksburg Standard Radio-Post

2023 BMW M5 in Woodbridge, NJ - $84,888

0 Reviews

I'm interested
Message Successfully Sent!
Dealer
Hello,
I would like to learn more about the 2023 BMW M5 that you have in your inventory. Please contact me as soon as you can.
Thank you.
By using this feature, you agree to EveryCarListed.com’s Terms of Use.
Seller's Comments
NJs #1 used car dealership | Auto Club of Edison | affordable vehicles, luxury, exotic, and performance cars for sale | Edison, NJ | call (732) 630-7777 This vehicle is a BMW M5 Sedan all wheel drive, made in 2023 with 12,265 miles. It has a low mileage and features a 4.4 liter Twin Turbo V8 600hp 553 lb-ft engine with twin turbo for fuel economy in city of 15 mpg and fuel economy on highway of 21 mpg. It also has blind spot sensor, hill start assist, full time four wheel drive, interior with leather accents, navigation system with voice recognition, and navigation with touch screen display. This car is truly a marvel of automotive engineering and design. Contact Details: Auto Club of Edison Sales Team, 540 US 1, Edison, NJ, 08817, sales@autoclubofedison.com, (732) 630-7777. for details or to browse our full inventory of affordable vehicles, luxury, exotic, and performance cars, contact auto club of edison today. proudly serving edison, woodbridge, metuchen, new brunswick, iselin, south plainfield, piscataway, rahway, clark, plainfield, scotch plains, westfield, cranford, linden, carteret, sayreville, trenton, little silver, elizabeth, somerset, union, newark, bayonne, irvington, east orange, new york city, and philadelphia. call now at (732) 630-7777
Vehicle Highlights
Price
$84,888
Mileage
12,265
Color
White
Condition
Used
Drivetrain
AWD
Engine
8 CYL.
Transmission
Automatic
Fuel
VIN
WBS83CH01PCL12958
Stock Number
AGM057
Location
US, NJ
Features
ABS Brakes (4-Wheel)
Adjustable Rear Headrests
Air Conditioning - Front - Automatic Climate Control
Air Conditioning - Front - Dual Zones
Air Conditioning - Rear - Automatic Climate Control
Air Conditioning - Rear - Dual Zones
Air Conditioning - Rear - With Independent Controls
Air Conditioning Air Filtration: Active Charcoal
Airbags - Front - Dual
Airbags - Front - Knee
Airbags - Front - Side
Airbags - Front - Side Curtain
Airbags - Passenger - Occupant Sensing Deactivation
Airbags - Rear - Side Curtain
Ambient Lighting Color-Adjustable
Audio - Antenna: Diversity
Audio - Antenna: Mast
Audio Auxiliary Input: IPod/IPhone Integration
Audio Auxiliary Input: USB
Auto-Lock
Blind Spot Sensor
Braking Assist
Braking assist hill start assist
Cargo Area 12V Power Outlet
Cargo Area Light
Center Console Front Console With Armrest And Storage
Child Safety Locks
Child Seat Anchors LATCH System
Clock
Compass
Cornering Brake Control
Cross Traffic Alert Rear
Cruise Control
Crumple Zones Front
Daytime Running Lights LED
Digital Odometer
Door Courtesy Lights
Doors Rear Door Type: Power Liftgate
Driver Adjustable Suspension: Ride Control
Driver Attention Alert System
Driver Seat Adjustable Lumbar Support: 4-Way Power
Driver Seat Heated
Driver Seat Power Adjustments: 20
Driver Seat Power Adjustments: Recline
Drivetrain 4WD Type: Full Time
Drivetrain Drive Mode Selector
Drivetrain Locking Differential: Rear
Easy Entry Power Steering Wheel
Electronic Brakeforce Distribution
Electronic Messaging Assistance With Voice Recognition
Electronic Parking Brake Auto Off
Emergency Braking Preparation
Emergency Interior Trunk Release
Engine Auto Stop/Start
Engine Push-Button Start
Exterior Entry Lights Puddle Lamps
Exterior Entry Lights Security Approach Lamps
Exterior Mirrors Driver Side Auto-Dimming
Exterior Mirrors Heated
Exterior Mirrors Integrated Turn Signals
Exterior Mirrors Power
Exterior Mirrors Power Folding
Exterior Mirrors Reverse Gear Tilt
External Temperature Display
Floor Mat Material Carpet
Front 12V Power Outlet(s)
Front Headrests Power Adjustable
Front Seatbelts: 3-Point
Front Suspension Classification: Independent
Front Suspension Type: Double Wishbones
Front Suspension Type: Strut
Fuel Economy Display MPG
Fuel Economy Display Range
Head-Up Display
Headlights Auto Delay Off
Headlights Auto On/Off
Headlights Automatic High Beam Dimmer
Headlights Cornering
Headlights LED
Headlights Self-Leveling
Heated Steering Wheel
Impact Sensor Alert System
Impact Sensor Battery Disconnect
Impact Sensor Door Unlock
Impact Sensor Fuel Cut-Off
Impact Sensor Post-Collision Safety System
Inside Rearview Mirror Auto-Dimming
Interior Aluminum Accents
Interior Carbon Fiber Trim
Interior Leather Accents
Lane Deviation Sensors
Memorized Settings Includes Audio System
Memorized Settings Includes Climate Control
Memorized Settings Includes Driver Seat
Memorized Settings Includes Exterior Mirrors
Memorized Settings Includes Passenger Seat
Memorized Settings Includes Steering Wheel
Memorized Settings Number Of Drivers: 2
Mirror Color Body-Color
Multi-Function Display
Navigation System Hard Drive
Navigation System Touch Screen Display
Navigation System With Voice Recognition
Number Of Front Headrests 2
Number Of Rear Headrests 3
One-Touch Windows: 4
Parking Sensors Front
Parking Sensors Rear
Passenger Seat Heated
Passenger Seat Power Adjustments: 20
Passenger Seat Power Adjustments: Recline
Power Brakes
Power Steering Speed-Proportional
Power Windows: Remote Operation
Power Windows: With Safety Reverse
Pre-Collision Warning System Audible Warning
Pre-Collision Warning System Visual Warning
Pre-collision Warning System Vibrating Steering Wheel
Reading Lights Front
Reading Lights Rear
Rear 12V Power Outlet
Rear Bumper Color Body-Color
Rear Seats 40-20-40 Split Bench
Rear Seats Center Armrest: Folding With Pass-Thru
Rear Seats Center Armrest: With Cupholders
Rear Seats Split Folding
Rear Spoiler Lip
Regenerative Braking System
Remote Engine Start
Seatbelts Emergency Locking Retractors: Front
Seatbelts Emergency Locking Retractors: Front And Rear
Seatbelts Seatbelt Force Limiters: Front
Seatbelts Seatbelt Force Limiters: Front And Rear
Seatbelts Seatbelt Pretensioners: Front
Seatbelts Seatbelt Warning Sensor: Driver And Passenger
Seatbelts Second Row 3-Point
Seats - Driver Seat Power Adjustments: Height
Seats - Passenger Seat Power Adjustments: 4-Way Power Lumbar
Seats - Passenger Seat Power Adjustments: Height
Seats Front Seat Type: Sport Bucket
Security Anti-Theft Alarm System
Security Engine Immobilizer
Sport Suspension
Stability Control
Steering Wheel Mounted Controls Audio
Steering Wheel Mounted Controls Cruise Controls
Steering Wheel Mounted Controls Multi-Function Screen Controls
Steering Wheel Mounted Controls Paddle Shifter
Steering Wheel Mounted Controls Phone
Steering Wheel Mounted Controls Voice Recognition Controls
Steering Wheel Power Tilt And Telescopic
Suspension Active
Suspension Stabilizer Bar(s): Front
Suspension Stabilizer Bar(s): Rear
Tachometer
Tail And Brake Lights LED
Taillights Adaptive
Touch-Sensitive Controls
Traction Control
Traffic Sign Recognition
Trip Odometer
Universal Garage Door Opener Homelink
Vanity Mirrors Dual Illuminating
Warnings And Reminders Low Fuel Level
Warnings And Reminders Low Oil Level
Warnings And Reminders Maintenance Reminder
Windows Front Wipers: Rain Sensing
Windows Front Wipers: Speed Sensitive
Windows Front Wipers: Variable Intermittent
Windows Heated Windshield Washer Jets
Windows Lockout Button
Windows Rear Defogger
Vehicle data is subject to change without notice. The publisher assumes no responsibility for errors and/or omissions in the data and reserves the right to cancel, to terminate or not to process orders where the price or other material information on this site is inaccurate.
Consumer Reviews for the 2023 BMW M5

No reviews found. Be the first to submit a review!

Dealer Information

Dealer

Woodbridge, NJ 07095

 

Fredericksburg Standard

P.O. Box 1639
Fredericksburg, TX 78624-4228
830-997-2155