Fredericksburg Standard Radio-Post

2025 BMW M5 in Walled Lake, MI - $137,995

0 Reviews

I'm interested
Message Successfully Sent!
Dealer
Hello,
I would like to learn more about the 2025 BMW M5 that you have in your inventory. Please contact me as soon as you can.
Thank you.
By using this feature, you agree to EveryCarListed.com’s Terms of Use.
Vehicle Highlights
Price
$137,995
Mileage
4,627
Color
Condition
Used
Drivetrain
AWD
Engine
8 CYL.
Transmission
Automatic
Fuel
VIN
WBS83GV06SCV36683
Stock Number
M-696
Location
US, MI
Features
4-Wheel Disc Brakes
18 Speakers
ABS brakes
AM/FM radio: SiriusXM
Active Driving Assistant Pro
Adaptive suspension
Air Conditioning
Alloy wheels
Apple CarPlay & Android Auto Compatibility
Auto-dimming Rear-View mirror
Auto-dimming door mirrors
Auto High-beam Headlights
Automatic temperature control
Auto tilt-away steering wheel
BMW Assist eCall
BMW Curved Display w/HUD
BMW Iconic Glow Kidney Grille
BMW TeleServices
Bowers & Wilkins Surround Sound
Brake assist
Bumpers: body-color
Carbon Fiber Silver Thread High Gloss Trim
ConnectedDrive Services
Connected Package Pro
Delay-off headlights
Driver door bin
Driver vanity mirror
Driving Assistance Professional Package
Dual front impact airbags
Dual front side impact airbags
Electronic Stability Control
Emergency communication system: BMW Assist eCall
Executive Package
Extended Merino Leather Upholstery
Exterior Parking Camera Rear
Four wheel independent suspension
Front & Rear Heated Seats
Front Bucket Seats
Front Center Armrest
Front Ventilated Seats
Front anti-roll bar
Front beverage holders
Front dual zone A/C
Front reading lights
Fully automatic headlights
Garage door transmitter
Heads-Up Display
Heated door mirrors
Heated front seats
Heated steering wheel
Illuminated entry
Interior Camera
Leather steering wheel
Low tire pressure warning
M Compound Brakes w/Black Calipers
M Drive Professional
M Drivers Package
M Multi-Function Seats
Memory seat
Navigation System
Occupant sensing airbag
Outside temperature display
Overhead airbag
Panic alarm
Parking Assistant Plus
Passenger door bin
Passenger vanity mirror
Personal eSIM 5G
Power Front Seats
Power Liftgate
Power door mirrors
Power driver seat
Power passenger seat
Power steering
Power windows
Radio: AM/FM Audio System
Radio data system
Rain sensing wipers
Rear Manual Side Window Shades
Rear air conditioning
Rear anti-roll bar
Rear dual zone A/C
Rear reading lights
Rear seat center armrest
Rear window defroster
Remote keyless entry
Security system
SiriusXM Satellite Radio w/1 Year Subscription
Speed-Sensitive Wipers
Speed-sensing steering
Speed control
Split folding rear seat
Spoiler
Sport steering wheel
Steering wheel memory
Steering wheel mounted audio controls
Tachometer
Telescoping steering wheel
Tilt steering wheel
Traction control
Trip computer
Turn signal indicator mirrors
Variably intermittent wipers
Wheels: 20 x 10.5 Fr & 21 x 11 Rr M Dual-Spoke
Wheels: 20 x 10.5 Fr & 21 x 11 Rr M Dual Spoke
Wireless Device Charging
Vehicle data is subject to change without notice. The publisher assumes no responsibility for errors and/or omissions in the data and reserves the right to cancel, to terminate or not to process orders where the price or other material information on this site is inaccurate.
Consumer Reviews for the 2025 BMW M5

No reviews found. Be the first to submit a review!

Dealer Information

Dealer

Walled Lake, MI 48390

 

Fredericksburg Standard

P.O. Box 1639
Fredericksburg, TX 78624-4228
830-997-2155